EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Tucson Electric in 760 Megawatt Plant Expansion

LCG, Feb. 2, 2001Tucson Electric Power Co. will double the capacity of its Springerville Generating Station in northeastern Arizona by adding two 380 megawatt coal-fired units to the two already in operation, the utility's parent holding company said yesterday.

Bechtel Power Corp. will handle the construction, Unisource Energy Corp. said. Bechtel had originally designed the facility as a four-unit plant, and had completed construction of units one and two in 1985 and 1990. The new units will bring the plant up to its 1,520 megawatt design capacity.

The two new units, which will be placed in service in 2004 and 2005, are expected to be fully utilized between the energy needs of Tucson Electric's own customers and power purchase agreements with other Arizona energy companies.

James S. Pignatelli, Unisource chief executive, said "This project provides an excellent opportunity for the expansion of our existing resources to support the energy and reliability requirements of Arizona's residential, commercial and industrial customers."

Bechtel is no stranger to power plant development according to Eric Grenfell, a vice president and manager of fossil power for the Americas. "We have designed and constructed more than 100 baseload coal-fired facilities and 350 fossil-fired units since entering the power market in 1946," he said.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service