EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Perry Nuke Coasts Down to Refuel;Posts 98.2 Percent Capacity Factor

LCG, Feb. 16, 2001First Energy Corp.'s Perry nuclear power plant was reported at 87 percent of capacity this morning in the Nuclear Regulatory Commission daily plant status report. The reactor is coasting down to a refueling outage after running for 655 days at a capacity factor of 98.2 percent.

Perry was on-line for all but 11 of those 644 days and during the period ran off its longest continuous run a stretch of 399 days.

During the refueling outage, workers will replace a turbine rotor, which will be the final step in boosting the plant's output from 1,250 megawatts to 1,320 megawatts. About 1,000 workers will also attend to replacing more than a third of the reactor's fuel assemblies and performing other maintenance and repair operations that require a cold plant.

"Our work schedule is ambitious, but I am confident our employees will meet the challenge," saidJohn Wood, site vice president at Perry. "We expect to complete some 7,500 maintenance activities during the refueling to help continue strong operations until our next refueling in 2003."

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service