|
News
|
LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.
Read more
|
|
LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.
Read more
|
|
|
Industry News
Big Wind Farm Planned Near Amarillo, Texas
LCG, Feb. 28, 2001Southwestern Public Service Co., a unit of Xcel Energy Inc., and Cielo Wind Power announced jointly yesterday plans to build an 80 megawatt wind farm near White Deer, Texas, about 40 miles east of Amarillo.Construction of the facility, to be called Llano Estacado Wind Ranch at White Deer is scheduled to begin in July. Cielo will be the project developer and said it will take about six months to build the facility.The project will employ 80 Mitsubishi 1,000 kilowatt wind turbines, each of which is about 226 feet tall and weighs 160 tons. The three rotating blades have a diameter of 184 feet.Power generated when the wind blows at White Deer will be sold to Xcel Energy under a 15-year contract.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|