EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Big Wind Farm Planned Near Amarillo, Texas

LCG, Feb. 28, 2001Southwestern Public Service Co., a unit of Xcel Energy Inc., and Cielo Wind Power announced jointly yesterday plans to build an 80 megawatt wind farm near White Deer, Texas, about 40 miles east of Amarillo.

Construction of the facility, to be called Llano Estacado Wind Ranch at White Deer is scheduled to begin in July. Cielo will be the project developer and said it will take about six months to build the facility.

The project will employ 80 Mitsubishi 1,000 kilowatt wind turbines, each of which is about 226 feet tall and weighs 160 tons. The three rotating blades have a diameter of 184 feet.

Power generated when the wind blows at White Deer will be sold to Xcel Energy under a 15-year contract.

Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service