EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Wind Turbines Going Up In Ontario

LCG, July 12, 2002--A wind farm with a maximum output capacity of 9 megawatts is under construction in Ontario, Canada, approximately 165 miles northwest of Toronto.

The expected completion for the Ontario Power Generation-built installation is five months from now. British Energy plc holds a joint interest in Huron Wind with Ontario Power. The five turbines of 1.8 megawatts each were manufactured by Vestas, headquartered in Denmark.

The wind farm is close to Bruce Power stations A and B, which are also owned by British Energy. All are found on the shore of Lake Huron.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service