EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Calpine and ExxonMobil Sign CO2 Transportation and Storage Agreement for CCS Project in Texas

LCG, April 24, 2025--Exxon Mobil Corporation (ExxonMobil) announced yesterday an agreement with Calpine Corporation (Calpine) to transport and permanently store up to 2 million metric tons per annum (MTA) of CO2 from Calpine’s Baytown Energy Center, a natural gas-fired facility located near Houston, Texas. This is part of Calpine’s Baytown Carbon Capture and Storage (CCS) Project that is designed to add CCS for the facility’s CO2 emissions. The Calpine facility could then provide a 24/7 supply of low-carbon electricity to the Texas grid plus steam to nearby industrial facilities.

Read more

Doral Renewables Selects NovaSource as Partner to Deploy the 1.6-GWdc Mammoth Solar Project in Indiana

LCG, April 21, 2025--NovaSource Power Services ("NovaSource") recently announced that it has partnered with Doral Renewables and has been selected as the Operations and Maintenance ("O&M") and Generator Operator ("GO") for the Mammoth Solar Project, one of the largest agrivoltaics facilities in the United States.

Read more

Industry News

ISO Says California Has Enough Capacity for the Summer

LCG, April 22, 2003Californias Independent System Operator said that the state will likely have enough electricity capacity for the peak usage that will come this summer.

Yesterday, the ISO, a not-for-profit entity responsible for reliability in electricity transmission, released a report regarding this summer. In its view, California has sufficient surplus electric capacity to meet peak demand, which in the West comes during the hottest points in the year.

The ISO did note that major plant outages or damaged transmission would alter the otherwise positive forecast.

Summer peak demand is expected to be 42,894 MW, around 450 megawatts higher than during last year but still less than the all-time highest demand of 43,554 megawats, which occurred in the midst of an economic boom in July 1999.

Some analysts worry that the surplus electricity will be insufficient to meet demand in the next few years because new generation projects have been slowed, suspended, or even cancelled due to poor market conditions. Also, older plants, especially coal-fired generators, may slowly go off line as they deteriorate or fail to meet new environmental restrictions.

However, others may point to the fact that lower demand may be in part due to fewer customers because of the slowed economic conditions. Better economic conditions in the future may result in higher demand but may also catalyze new interest in plant development and the resumption of preexisting projects.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service