EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Jasper Generating Station Dedicated in SC

LCG, May 11, 2004--South Carolina Electric & Gas dedicated its new combined-cycle, gas-fired power plant in Jasper County, South Carolina, today.

The 875-megawatt plant has been operating since May 1, and uses natural gas brought to the facility through an 18.2-mile interestate pipeline. The pipeline transports gas from a liquefied natural gas site at Elba Island, Ga., which was recently brought back into operation. SCANA Corporation, the parent of SCE&G, also owns the new company responsible for building the pipeline, SCG Pipeline.

The Jasper plant is the largest plant burning fossil fuel within SCE&G's service territory.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service