EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Suniva Announces New Facility to Dramatically Increase Solar Cell Manufacturing Capacity in America

LCG, April 15, 2026--Suniva announced yesterday that it has entered agreements to bring a state-of-the-art 4.5 GW solar cell manufacturing facility to Laurens, South Carolina. The new facility, combined with Suniva’s existing facility at its headquarters in metro Atlanta, will bring the company’s total annual domestic solar cell manufacturing capacity to over 5.5 GW.

Read more

U.S. Coal-fired Generating Capacity Retirements in 2025 Are Less Than 20 Percent of Retirements in 2022

LCG, April 13, 2026--The EIA today released an "In-brief Analysis" of U.S. coal-fired generating capacity retirements in 2025. A highlight of the analysis is that, during 2025, the electric power sector retired 2.6 GW of coal-fired generating capacity at four power plants, which is (i) the least since 2010 and (ii) 5.9 GW less than the planned retirement of 8.5 GW at the beginning of 2025.

Read more

Industry News

CA Bill Would Reduce PG&E Interest Cost

LCG, May 24, 2004--A bill passed by the California state Senate that would allow the utility Pacific Gas & Electric to lower its interest costs is now in the hands of Gov. Schwarzenegger.

Assuming that Schwarzenegger signs Senate Bill 772, by Senator Debra Bowen, D-Marina del Rey, the California Public Utilities Commission would then act to allow the utility to issue bonds to refinance a regulatory asset of $2.21 billion. "The quicker we act, the quicker the rates go down," Michael Peevey, the president of the PUC, told an investor conference this past wednesday.

The refinancing could result in savings in the amount of $1 billion from lower interest and tax payments. The asset to be refinanced was created in the course of PG&E's bankruptcy reorganization. Peevey expressed the belief that new bonds would be issued this year.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service