EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

NRC Optimistic About Restarting TVA's Browns Ferry Nuclear Reactor

LCG, November 2, 2006--The chairman of the Nuclear Regulatory Commission (NRC) stated Tuesday that restarting Unit 1 at Browns Ferry Nuclear Plant in May of next year appears quite "doable." The reactivation of Unit 1 will add 1,200 MW of capacity to the generating fleet of the Tennessee Valley Authority (TVA).

TVA is the owner and operator of the plant, which is located beside Wheeler Reservoir on the Tennessee River, near Athens, Alabama. There are three General Electric boiling water reactors at the plant. Unit 1 commenced commercial operation on August 1, 1974, but safety concerns led to its closure in 1985. Units 2 and 3 were also closed for a period but returned to operations in the late 1990s and are currently generating power.

TVA plans to restart Unit 1 in May 2007 following plant upgrades that are estimated to cost $1.8 billion.

The TVA Board voted to return Browns Ferry Unit 1 to service in May 2002.




Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service