EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

PGE to Build Biglow Canyon Wind Project

LCG, November 28, 2006--Portland General Electric (PGE) announced yesterday that it will construct the Biglow Canyon Wind Farm in Sherman County, Oregon. The project, which was developed by Orion Energy LLC, will have an initial electric generating capacity of 125.4 MW that will be derived from 76 turbines manufactured by Vestas Wind Systems. PGE will operate the wind farm, which is scheduled to commence commercial operations by December 2007.

PGE plans to further expand the capacity of the Biglow Canyon Wind Farm to provide a total generating capacity of 350 to 450 MW. The additional capacity would be built in two, subsequent phases over the next five years.

Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service