EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Another Milestone Achieved for PPM's Twin Buttes Wind Power Project

LCG, September 7, 2007--The dedication ceremony for the Twin Buttes Wind Power Project is scheduled for next week. PPM Energy developed the 75-MW wind farm, and Xcel will purchase the power generated. Construction began in the fall 2006, and the project began generating power in July of this year.

The Twin Buttes Wind Power Project is located in southeastern Colorado in Bent County. The wind farm includes fifty, 1.5-MW turbines manufactured by GE. The turbines are installed over a 9,000 acre site that will remain ranchland. The estimated cost of the project is $100 million.

PPM Energy also jointly owns another wind farm, Colorado Green, in the vicinity with Shell WindEnergy Inc. Colorado Green, which is located in Prowers County, Colorado, consists of 108 GE Wind Energy 1.5 MW turbines and has a generating capacity of 162 MW. Shell WindEnergy and PPM Energy own the project in a 50/50 joint venture.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service