EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Texas Poised to Invest $4.93 Billion in Transmission System Expansion for Wind Power

LCG, July 18, 2008--The Public Utility Commission (PUC) of Texas yesterday chose an electric transmission system expansion scenario that will enable the development of 18,456 MW of wind farms located in remote areas in West Texas and the Texas Panhandle. The PUC was directed by Senate Bill 20 to create a transmission plan that will increase transmission capacity to allow new wind power from remote areas to flow to load centers in Texas.

The Electric Reliability Council of Texas (ERCOT) on April 2 filed five alternative electric transmission expansion plans with the PUC, ranging from 12,053 MW to 24,419 MW of assumed new wind generation installed in the most productive wind zones in Texas. The estimated cost for the selected scenario is $4.93 billion, and the new transmission facilities are planned to be installed within four to five years.

Proponents of the expansion expect reduced emissions from power plants consuming fossil fuels and additional jobs in many areas. Opponents stated that the capital costs - which approach $5 billion - should be borne by the power generation developers that will benefit from the expansion, rather than borne just by consumers.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service