EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

PGE Completes Phase II of Biglow Canyon Wind Project

LCG, August 24, 2009--Portland General Electric Company (PGE) announced Friday that Phase II of the Biglow Canyon Wind Farm is complete, adding 150 MW of new wind power available for delivery to the grid. The wind farm is located in Sherman County, Oregon.

Phase II includes 65 new wind turbines, manufactured and installed by Siemens Energy, that each have an electric generating capacity of 2.3 MW.

Phase I of Biglow Canyon Wind Farm was completed at the end of 2007 and included 76 turbines, with an installed capacity of 125 MW of electricity. The total capacity of Biglow Canyon Wind Farm is now 275 MW.

There is a third phase planned, which will add 76 more turbines and increase the installed capacity to 450 MW. Phase III is scheduled for commercial operation in 2010.

Biglow Canyon Wind Farm was developed by Orion Energy LLC, and PGE constructed the project. PGE will also own and operate the facilities.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service