EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Kentucky Power Withdraws Request to Retrofit Big Sandy

LCG, May 31, 2012--American Electric Power's subsidiary, Kentucky Power, asked to withdraw its request to invest $940 million in environmental controls on its coal-fired Big Sandy power plant. The Kentucky Public Service Commission was already scheduled to issue its decision to permit the controls by Monday.

Kentucky Power, like other owners of coal-fired power plants, is evaluating costly compliance options in response to growing federal regulations, such as the utility mercury and air toxics standards (MATS), driven by the United States Environmental Protection Agency (EPA). Uncertainty on near-term emission control project costs, plus future incremental costs to comply with new regulations that may arise, makes it more and more attractive to retire coal-fired plants and invest in new plants fueled with low-cost natural gas.

The Big Sandy plant was commissioned in 1963 and includes two units with a combined electric generating capacity of 1,078 MW. In March, Kentucky Power requested to install a scrubber on the 800-MW unit to reduce emissions and to retire the smaller, 278-MW unit. Kentucky Power stated the reason to withdraw the request was "the ever-changing energy landscape" and that alternative power supplies could be purchased to replace the energy that would otherwise be generated from Big Sandy. Big Sandy is expected to continue operations prior to the EPA compliance deadlines, which will arrive in the next couple years.

According to the PSC, the investment in emission controls for Big Sandy was estimated to have raised a residential customer's monthly electric bill by about $31, or 30 percent, beginning in 2016.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service