|
News
|
LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.
Read more
|
|
LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.
Read more
|
|
|
Industry News
Panda Power Funds Breaks Ground on Marcellus Shale-Gas Power Plant in Pennsylvania
LCG, August 13, 2014-The ground breaking ceremony for Panda Power Funds' combined-cycle power project occurred yesterday in Lycoming County, Pennsylvania. The Panda Patriot Power Project is a natural gas-fired, 829-MW project that is strategically sited in the Marcellus Shale formation, one of the largest natural gas fields in the world. The project is scheduled to enter commercial operations in mid-2016.
The Panda Patriot Power Project will deliver electricity into the eastern area of the PJM Interconnection, offsetting in part planned retirements of coal-fired electric generating units in the region.
The Panda Patriot Power Project is located on an 85-acre site, approximately 60 miles north of Harrisburg. Siemens Energy Inc. will provide the power island package, including the H-class gas turbines, steam turbines, generators, heat recovery steam generators (HRSGs), and instrument and control systems. The project includes an air cooling system, rather than water, to avoid the need to discharge water into the Western Branch of the Susquehanna River and the potential impacts to sensitive species in the Susquehanna watershed.
Panda Power Funds is also using Siemens power island packages at two new 758-MW, combined cycle sites in Texas: Panda Sherman and Panda Temple I, which are scheduled to begin operations this year. Furthermore, Panda Power plans to complete another combined cycle block, Temple II in Texas, which is scheduled to begin operations in 2015.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|