News
LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.
Read more
|
LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.
Read more
|
|
|
Industry News
GRDA Holds Groundbreaking Ceremony for Combined Cycle Project at Grand River Energy Center in Oklahoma
LCG, January 27, 2015-The Grand River Dam Authority (GRDA) held the groundbreaking ceremony on January 23 for its combined cycle project at the Grand River Energy Center in Chouteau, Oklahoma. The 495-MW, gas-fired generation project is estimated to cost $297 million and is scheduled for completion in early 2017.
The new combined cycle project will utilize the Mitsubishi Hitachi Power Systems Americas (MHPSA) J-Series gas turbine, and the installation of this MHPSA J-series will be the first in the nation. In January 2014, GRDA selected MHPSA to supply the M501J (328-MW) gas turbine, an SRT-50 (167-MW) steam turbine, and a generator to be supplied by Mitsubishi Electric Corporation.
The Grand River Energy Center, located approximately 35 miles east of Tulsa, currently includes two coal-fired units that were installed in the 1980s. GRDA plans to install new emissions control equipment on Unit 2. A number of options are under consideration for Unit 1, including: retiring the unit in 2016, installing emission controls, or converting the unit to burn natural gas, rather than coal.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|