EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Tri-State Announces Agreement for 30-MW Solar Energy Project in Colorado

LCG, September 2, 2015--Tri-State Generation and Transmission Association, Inc. and juwi Inc. yesterday announced a 25-year power purchase agreement (PPA) to supply the utility with renewable energy from the planned San Isabel Solar Project. Tri-State will purchase the entire output from the solar facility over the life of the contract. The 30-MW project is located in southern Colorado and is scheduled for completion in the fourth quarter of 2016.

The San Isabel Solar Project will include over 100,000 solar photovoltaic (PV) panels. The project will be installed on 250 acres of land in Las Animas County, which lies within the service territory of San Isabel Electric Association (SIEA), a Tri-State member system.

The 30-MW project is Tri-State's second utility-scale solar PPA in its resource portfolio. In 2010, Tri-State began receiving power from the 30-MW Cimarron Solar facility in northern New Mexico.

The San Isabel Solar Project is the second renewable PPA for Tri-State in 2015. In June, Tri-State announced the PPA with Iberdrola Renewables for the 76-MW Twin Buttes II Wind Project south of Lamar, Colorado. Tri-State will purchase the entire output of the wind farm, which is scheduled for completion in 2017.

Tri-State's senior vice president of energy management stated, ???We have taken a steady, deliberate approach to integrating renewable resources, and it has paid off over time as we continue to build a generation fleet that remains cost-effective for our member systems. The San Isabel Solar Project is rewarding because it represents a true partnership among Tri-State, SIEA and an innovative developer like juwi."

In 2014, 24 percent of the energy Tri-State and its member systems delivered to cooperative members was generated from renewable resources.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service