|
News
|
LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.
Read more
|
|
LCG, November 5, 2026--NTT DATA, an AI, digital business and technology services company, today announced an agreement with Bloom Energy to deploy 900 MW of Bloom Energy's fuel cell technology to power multiple data center projects around the world. The agreement is Bloom Energy's largest international project to date.
Read more
|
|
|
Industry News
Congestion in the Texas Panhandle: LCG Consulting investigates ERCOT’s rapid wind development and Lubbock Power & Light joining the ERCOT grid
LCG, May 10, 2016--LCG Consulting has released a new study of wind energy development in the Panhandle Renewable Energy Zone, or PREZ, of Texas, where ERCOT has proposed significant changes in the infrastructure to enable sustained wind development and ensure stability of the grid. LCG’s study, ERCOT Panhandle Renewable Energy Zone and Lubbock Power & Light Integration, looks at how these changes affect power flow and locational marginal prices under various scenarios and transmission upgrade options. It outlines infrastructure challenges, current developments in wind curtailment due to Panhandle congestion, and it provides an outlook for wind generation in the region. Analysis was conducted using the UPLAN Network Power Model which replicates ERCOT ISO protocols and market procedures.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|