EnergyOnline

News

Canadians Achieve Record Year in 2014 for Wind Farm Installations

LCG, January 23, 2015--The Canadian Wind Energy Association (CanWEA) announced that in 2014 Canada set a record for the installation of new wind energy capacity. A total of 1,871 MW of electric generating capacity was installed, increasing Canada's wind farm generating capacity to nearly 9,700 MW at year-end.

WPS Files Application with the Public Service Commission of Wisconsin to Build Combined Cycle Facility at Fox Energy Center

LCG, January 22, 2015--Wisconsin Public Service Corp. (WPS) submitted its application for permission from the state Public Service Commission to install a 400-MW natural gas-fired, combined-cycle generating unit at the Fox Energy Center in Kaukauna, Wisconsin. The estimated cost of the project is $517 million. Construction is anticipated to begin late in the spring of 2016.

LOGIN

You need to login to access this part of the website.

User Name  
Password  


If you have forgotten your password, please contact LCG.

Copyright © 2015  LCG Consulting. All rights reserved. Terms and Copyright
Energy Price (Actuals)
ERCOT 1/25/2015 0:00 $18.75
MISO 1/25/2015 15:00 $26.47
NYISO 1/25/2015 16:00 $21.96
NEISO 1/24/2015 23:00 $10.11
CAISO 1/24/2015 23:00 $25.88
PJM 1/25/2015 16:00 $26

Products

Generator X Generator X
Power System Planning and Optimization

UPLAN-NPM   UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model

UPLAN-ACE   UPLAN-ACE
Energy Model for Day-Ahead Market Operation and Real-Time Dispatch

PowerMax   PowerMax
Day-ahead and real-time portfolio revenue optimization

UPLAN-G   UPLAN-G
The Gas Procurement and Competitive Analysis System

Plato   PLATO
Database of Plants, Loads, Assets, Transmission...

Services

MarketVision MarketVision
Daily LMP Forecast for ERCOT

2015 CAISO CRR CAISO CRR Auctions
CAISO CRR Auctions