EnergyOnline

News

Coal-Fired Generation at the Intermountain Power Project to End in 2025

LCG, May 25, 2017--The owners of the Intermountain Power Project announced on May 23 that they will cease electricity generation fueled by coal in 2025. The decision is driven by the loss of existing customers, environmental regulatory issues, and competition from both gas-fired generation that benefits from low natural gas prices and growing renewable (wind and solar) capacity supported by state renewable portfolio standards (RPS???s).

Read more

DONG Energy Announces Opening of the Burbo Bank Extension Project with 8-MW Offshore Wind Turbines

LCG, May 23, 2017--The Burbo Bank Extension Project, a new offshore wind farm in Liverpool Bay, UK, opened on May 17 and became the first offshore wind farm to make commercial use of the MHI Vestas V164-8.0 MW wind turbines. The wind farm is a joint venture between DONG Energy (50%) and its partners PKA (25%) and KIRKBI A/S, parent company of the LEGO Group (25%).

Read more
Error 404

Page not found

The page you requested cannot be found. The page you are looking for might have been removed, had its name changed, or is temporarily unavailable.

Please go to the EnergyOnline homepage and look for links to the information you want or use the navigation bar on the top of the page.

Copyright © 2017 LCG Consulting. All rights reserved. Terms and Copyright
Search
Generator X
Generation and Transmission Planning and Optimization
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
PowerMax
Day-ahead and real-time portfolio revenue optimization
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
MarketWatch
Monthly summary of prices, congestion and important events in ERCOT
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service