EnergyOnline

News

New Hurdle for Sunflower's Coal-fired Project in Kansas

LCG, July 2, 2009--The United States Environmental Protection Agency (EPA)issued a letter Wednesday to Kansas Governor Mark Parkinson, Kansas Department of Health and Environment (KDHE) and Sunflower Electric Power Corporation (Sunflower) directing Sunflower to restart the permit process for a proposed 895-MW, coal-fired unit planned at an existing electric generating station near Holcomb, Kansas.


SWEPCO Appeals Court Decision - and Proceeds with Construction at Coal Plant

LCG, July 1, 2009--Southwestern Electric Power Company (SWEPCO) requested the Arkansas Supreme Court to review last week's court decision aimed to block further development of the proposed John W. Turk Jr. electric generating station, a 600-MW, coal-fired project in Hempstead County, Arkansas.


Error 404

Page not found

The page you requested cannot be found. The page you are looking for might have been removed, had its name changed, or is temporarily unavailable.

Please go to the EnergyOnline homepage and look for links to the information you want or use the navigation bar on the top of the page.

Copyright © 2009 LCG Consulting. All rights reserved. Terms and Copyright

Search

Products

UPLAN-NPM   UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model

Wind   Wind
Wind Power Development

UPLAN-G   UPLAN-G
The Gas Procurement and Competitive Analysis System

Utrack   UTRACK
The UPLAN Daily Tracking and Database Management System

Plato   PLATO
Database of Plants, Loads, Assets, Transmission...

UPLAN-MAM   MAM
UPLAN MAM (Multi Area Model)