EnergyOnline

News

Presidential Permit Process Advances for Emera's Atlantic Link Transmission Project

LCG, December 6, 2017--Clean Power Northeast Development, a subsidiary of Emera Inc., has applied to the U.S. Department of Energy (DOE) for a Presidential Permit, requesting authorization to build the Atlantic Link subsea electric transmission project, a 1,000-MW, high-voltage direct current (HVDC) transmission interconnection extending approximately 375 miles to deliver wind and hydro power from Atlantic Canada directly to Massachusetts. The proposed in-service date is late 2022.

Read more

We Energies to Close Pleasant Prairie Coal Plant in 2018

LCG, November 30, 2017--WEC Energy Group announced Tuesday that it will shut down the coal-fired, Pleasant Prairie electric generating facility in the second quarter of 2018. WEC Energy Group's Wisconsin operations include We Energies and Wisconsin Public Service.

Read more
Error 404

Page not found

The page you requested cannot be found. The page you are looking for might have been removed, had its name changed, or is temporarily unavailable.

Please go to the EnergyOnline homepage and look for links to the information you want or use the navigation bar on the top of the page.

Copyright © 2017 LCG Consulting. All rights reserved. Terms and Copyright
Search
Generator X
Generation and Transmission Planning and Optimization
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
PowerMax
Day-ahead and real-time portfolio revenue optimization
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
MarketWatch
Monthly summary of prices, congestion and important events in ERCOT
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service