EnergyOnline

News

Arizona Biomass Project Nears Commercial Operations

LCG, May 15, 2008--Renegy Holdings, Inc. (Renegy) yesterday issued an update on its business activities for the first quarter of 2008. A key accomplishment is completing a 24-MW, power project located near Snowflake, Arizona that uses biomass as fuel. Renegy has 20-year, power-purchase agreements (PPAs) for the project with Arizona Public Service Company (APS) and Salt River Project (SRP).


KCP&L's Cost Estimate for New Coal Unit Rises

LCG, May 9, 2008--Kansas City Power & Light (KCP&L) yesterday released a new, increased cost estimate for Iatan 2 of $1.82 - $1.92 billion, or about a 15 percent increase from the most recent estimates of December 2006. Prior to an increase in the design capacity, a "preliminary conceptual" estimate prepared in 2005 targeted the cost at $1.3 billion. Construction of the 850-MW, coal-fired unit located near Weston is scheduled for completion in the summer of 2010.


Error 404

Page not found

The page you requested cannot be found. The page you are looking for might have been removed, had its name changed, or is temporarily unavailable.

Please go to the EnergyOnline homepage and look for links to the information you want or use the navigation bar on the top of the page.

Copyright © 2008 LCG Consulting. All rights reserved. Terms and Copyright

Search

Products

UPLAN-NPM   UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model

Wind   Wind
Wind Power Development

UPLAN-G   UPLAN-G
The Gas Procurement and Competitive Analysis System

Utrack   UTRACK
The UPLAN Daily Tracking and Database Management System

Plato   PLATO
Database of Plants, Loads, Assets, Transmission...

UPLAN-MAM   MAM
UPLAN MAM (Multi Area Model)