EnergyOnline

News

KCP&L's Cost Estimate for New Coal Unit Rises

LCG, May 9, 2008--Kansas City Power & Light (KCP&L) yesterday released a new, increased cost estimate for Iatan 2 of $1.82 - $1.92 billion, or about a 15 percent increase from the most recent estimates of December 2006. Prior to an increase in the design capacity, a "preliminary conceptual" estimate prepared in 2005 targeted the cost at $1.3 billion. Construction of the 850-MW, coal-fired unit located near Weston is scheduled for completion in the summer of 2010.


DOE Awards $126.6 Million to Carbon Sequestration Projects

LCG, May 7, 2008--The U.S. Department of Energy (DOE) yesterday announced awards of over $126.6 million to two carbon sequestration projects designed to demonstrate the potential for permanent storage of over one million tons of carbon dioxide (CO2) in geologic formations. A critical goal of the DOE is to develop carbon sequestration capabilities that will better enable the long-term use of coal for power production while controlling CO2 emissions to address climate change concerns.


Error 404

Page not found

The page you requested cannot be found. The page you are looking for might have been removed, had its name changed, or is temporarily unavailable.

Please go to the EnergyOnline homepage and look for links to the information you want or use the navigation bar on the top of the page.

Copyright © 2008 LCG Consulting. All rights reserved. Terms and Copyright

Search

Products

UPLAN-NPM   UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model

Wind   Wind
Wind Power Development

UPLAN-G   UPLAN-G
The Gas Procurement and Competitive Analysis System

Utrack   UTRACK
The UPLAN Daily Tracking and Database Management System

Plato   PLATO
Database of Plants, Loads, Assets, Transmission...

UPLAN-MAM   MAM
UPLAN MAM (Multi Area Model)