EnergyOnline

News

Progress Energy Executes Contract for New Nuclear Station

LCG, January 6, 2009--Progress Energy yesterday announced that it signed a $7.65 billion contract for two planned nuclear reactors to be constructed at a greenfield site in Levy County near Crystal River, Florida. The contract scope includes nuclear engineering, procurement and construction (EPC) by Westinghouse Electric and The Shaw Group. The total cost of the nuclear power station is estimated to be over $17 billion.


ACCIONA Completes 46-MW Solar Plant in Portugal

LCG, December 31, 2008--ACCIONA Energy announced Monday that it placed into service a 46-MW solar photovoltaic (PV) power plant built in Portugal's Alentejo region near the border with Spain. The facility was constructed by ACCIONA Solar, a subsidiary of ACCIONA Energy, and is owned by entirely by ACCIONA.


Error 404

Page not found

The page you requested cannot be found. The page you are looking for might have been removed, had its name changed, or is temporarily unavailable.

Please go to the EnergyOnline homepage and look for links to the information you want or use the navigation bar on the top of the page.

Copyright © 2008 LCG Consulting. All rights reserved. Terms and Copyright

Search

Products

UPLAN-NPM   UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model

Wind   Wind
Wind Power Development

UPLAN-G   UPLAN-G
The Gas Procurement and Competitive Analysis System

Utrack   UTRACK
The UPLAN Daily Tracking and Database Management System

Plato   PLATO
Database of Plants, Loads, Assets, Transmission...

UPLAN-MAM   MAM
UPLAN MAM (Multi Area Model)


PROJECTS