EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

LG Electronics Suspends Conergy Solar Joint-Venture Plans

LCG, November 13, 2008--LG Electronics (LG) announced late last week that it has discontinued discussions with Germany's Conergy AG (Conergy) regarding the creation of a joint venture for solar cell manufacturing due to current global financial uncertainty and differences in strategic directions. LG stated it will continue to explore opportunities in solar photovoltaic cell and module manufacturing.

LG and Conergy announced September 11 that they had executed a non-binding, Memorandum of Understanding (MOU) to form a joint venture in the solar module manufacturing business. LG was to have purchased a 75 percent stake in Conergy's solar module plant in Frankfurt, with Conergy retaining the remainder.

In October, LG announced that it plans to convert its A1 plasma panel-manufacturing line in Gumi, Korea, into two, crystalline silicon solar cell production lines. The first production line is scheduled to commence production in early 2010, with a second line entering production a year later.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service