EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Local Opposition to Cape Wind Project Persists

LCG, June 19, 2009--Cape Wind Associates must respond to continued local opposition to its wind farm planned for installation in Nantucket Sound, about five miles off the shore of Massachusetts. The project developer, Cape Wind, has pursued government approval since 2001.

The Cape Cod Commission (CCC), a local land-use planning and regulatory agency, together with the city of Barnstable and the Alliance to Protect Nantucket Sound, appealed the Massachusetts Energy Facilities Siting Board?s approval of the Cape Wind offshore energy project. The Massachusetts Supreme Judicial Court will hear the appeal.

On May 28, the Massachusetts Energy Facilities Siting Board completed a Certificate of Environmental Impact and Public Interest granting all of the state and local permits necessary for the Cape Wind Associates wind energy project to proceed to construction. The Siting Board voted 7-0 to grant the Certificate, with minor modifications.

The Cape Wind Energy Project has a design generating capacity of 468 MW and includes 130 wind turbines that would - at the highest blade tip - extend 440 feet above the surface of the water. Concerns of opponents to the project include the visibility of the wind farm and related impacts on tourism.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service