|
News
|
LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.
Read more
|
|
LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.
Read more
|
|
|
Industry News
Alliant Energy to Proceed with 500-MW New Wind Project
LCG, October 28, 2016--Alliant Energy's Iowa-based subsidiary Interstate Power & Light (IPL) announced yesterday that it will proceed with the New Wind Project, which will add up to 500 MW of new wind generation in Iowa. Construction may commence as early as next year. Alliant Energy expects that 250 MW of wind farm electric generating capacity will commence operations in 2019, with the remainder delivering power to the grid in 2020.
The Iowa Utilities Board (IUB) issued a final order regarding the New Wind Project on October 25 that approves, with limited modifications, the settlement between Alliant Energy and customer groups that was filed on October 12, 2016.
"The New Wind Project will benefit our customers, our communities and the state," said the president of IPL. "The wind turbines will generate clean, cost-effective energy for customers. They also create tax revenue for communities, and bring construction jobs and economic growth to the state, making this a win-win project."
Alliant Energy is currently evaluating sites near its existing Whispering Willow Wind Farm and other areas of the state.
In announcements last August, Alliant's CEO stated that the timing of the project is designed to take advantage of the federal wind energy production tax credit (PTC). Similarly, MidAmerican Energy set forth and received approval from the IUB last summer for its plans to construct in Iowa the Wind XI project, with a design capacity of 2,000 MW and an estimated cost of $3.6 billion. Like Alliant's project, the MidAmerican Energy project schedule is driven to maximize the federal PTC, which is set to decline in value by 20 percent by year, beginning in 2017.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|