|
News
|
LCG, May 19, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a long-term Power Purchase Agreement (PPA) with Puget Sound Energy (PSE) for the 199.5-MW Big Horn I wind project in Klickitat County, Washington. This agreement represents the fourth PPA executed by the two companies for projects in the Pacific Northwest.
Read more
|
|
LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.
Read more
|
|
|
Industry News
How to Make the Grid Secure
LCG March 1, 2021--February’s winter weather has brought a new level of uncertainty to the Texas grid, on top of rapid renewables growth and hot summer weather. Not only did the blackouts solidify the need to plan for extreme weather in winter and summer, but they also brought Texas residents, the governor, and the legislature into a public conversation about demand-supply planning.
This cost-benefit study "The Grid Security Question" was published in Public Utility Fortnightly in January 2004 to assess the value of synchronized reserves in preventing the severity of the blackout. Some of the proposed solutions may be relevant now for the blackout of ERCOT.
Download
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|