|
News
|
LCG, May 19, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a long-term Power Purchase Agreement (PPA) with Puget Sound Energy (PSE) for the 199.5-MW Big Horn I wind project in Klickitat County, Washington. This agreement represents the fourth PPA executed by the two companies for projects in the Pacific Northwest.
Read more
|
|
LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.
Read more
|
|
|
Industry News
Gas Pipeline Connects Russia and Turkey
LCG, June 4, 2002--The $2.3 billion Blue Stream project, a gas pipeline from Russia to Turkey, has been completed and is ready for testing.Eni SpA, an Italian oil and gas company, installed the pipeline in the Russian part of the Black Sea and says that the testing for both of the two lines created in the project will be completed by the end of the year.The pipeline will annually move 16 billion cubic meters of gas from Russia to Turkey. The 24-inch diameter pipelines span 239 miles (384 kilometers) and are at an underwater depth of up to 2,150 meters.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|