EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DTE Energy Invests in 1.5 GW of Michigan-made Battery Energy Storage Systems for Eight Projects

LCG, May 28, 2026--DTE Energy yesterday announced a $1.6 billion investment to develop Michigan-made battery energy storage systems across Michigan through partnering with LG Energy Solution Vertech, the U.S. energy storage division of LG Energy Solution.

Read more

Microsoft and Avangrid Sign PPA for Bluebird Solar Project in Washington State

LCG, May 27, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a Power Purchase Agreement (PPA) with Microsoft for the 140 MWdc (100 MWac) Bluebird Solar project in Klickitat County, Washington. Bluebird is located near four other energy projects owned and operated by Avangrid in Klickitat County and represents another $300 million investment in the community. The Bluebird Solar project is expected to achieve commercial operation in 2028.

Read more

Industry News

Output of LA Solar Panels Less than Expected

LCG, Jan. 5, 2003--Members of the staff of the Los Angeles Department of Water and Power have found that some solar installations around the city, of which there are approximately 500, are producing less electricity than had been anticipated when the projects were under consideration.

The difference between the expected output at six large projects and the actual generation may be due in part to the fact that the panels do not receive the same amount of solar energy in actual use as they do under laboratory conditions. Two of the projects, found at the Los Angeles Convention Center, had output of 29 and 37 percent of design capacity. "The losses are extremely high with what we're picking up with these installations," Henry Martinez, assistant general manager for power generation, told the Los Angeles Daily News.

At the campus of California State University, Northridge, infrastructure manager Tom Brown commented that installations were "performing very close the manufacturer's label." Panels shading a parking lot on campus were rated for 225 kilowatts, and were receiving between 82 and 189 kilowatts, depending on the amount of sun, although Brown expected they would achieve performance of up to 200 kilowatts.

In a report by the LADWP's chief legislative analyst, the cost of the city's solar power was found to be approximately 80 cents. Many solar projects in California have been subsidized with incentive funding, either from the DWP or the federal government. The funding has meant that Northridge can expect to recoup its costs for solar projects in about 10 years, as opposed to 25 to 30 years otherwise, Brown told the Daily News.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service