|
News
|
LCG, May 19, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a long-term Power Purchase Agreement (PPA) with Puget Sound Energy (PSE) for the 199.5-MW Big Horn I wind project in Klickitat County, Washington. This agreement represents the fourth PPA executed by the two companies for projects in the Pacific Northwest.
Read more
|
|
LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.
Read more
|
|
|
Industry News
Georgia EPD Issues Draft Permits for Proposed Coal-fired Power Plant in Georgia
LCG, August 26, 2009--POWER4Georgians, a coalition of Georgia electric membership cooperatives (EMCs), announced yesterday that the Georgia Environmental Protection Division (EPD) issued draft permits for their proposed coal-fired, power plant in Georgia. The Georgia EPD issued drafts of the air permit, the surface water withdrawal permit, the groundwater withdrawal permit, and the water discharge permit.
The proposed power station, Plant Washington, would be an 850-MW, electric generating station located on a 1,600-acre site in Washington County, Georgia. The project incorporates supercritical technology to improve efficiency and better enable reduced emissions.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|