|
News
|
LCG, April 2, 2026--Southwest Power Pool (SPP) today announced that the expansion of its service territory into the Western Interconnection has been a success. The milestone makes SPP the first regional transmission organization (RTO) with services spanning the Eastern and Western Interconnections. Its member organizations, which cover all or part of 17 states, can now benefit from a more operationally and geographically diverse integrated system.
Read more
|
|
LCG, March 31, 2026--Holtec International yesterday announced that it successfully completed a milestone test necessary to return Holtec's Palisades Nuclear Generating Station to service. The 805-MW pressurized water reactor (PWR) is located in Michigan and was shut down by Entergy in May 2022. Holtec acquired the facility in June 2022 and has pursued a path to return the plant to service.
Read more
|
|
|
Press Release
LCG Publishes 2023 Annual Outlook for Texas Electricity Market (ERCOT)
LCG, June 6, 2022 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2023, based on the most likely weather, market, transmission, and generator conditions. Compared to the 2022 outlook, Texas is expected to host more uncertainty as the prediction horizon is extended further by one year. This Outlook presents the future operation of the ERCOT nodal market, including Locational Marginal Prices (LMPs), load zone prices, hub prices, and expected congestion in 2023.
Download
Readers can DOWNLOAD the Report clicking the button above. For more information on LCG’s products and services, contact Julie Chien at julie.chien@energyonline.com
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|