EnergyOnline
Industry

RSS FEED

EnergyOnline.com rss

News

KCP&L's Cost Estimate for New Coal Unit Rises

LCG, May 9, 2008--Kansas City Power & Light (KCP&L) yesterday released a new, increased cost estimate for Iatan 2 of $1.82 - $1.92 billion, or about a 15 percent increase from the most recent estimates of December 2006. Prior to an increase in the design capacity, a "preliminary conceptual" estimate prepared in 2005 targeted the cost at $1.3 billion. Construction of the 850-MW, coal-fired unit located near Weston is scheduled for completion in the summer of 2010.


DOE Awards $126.6 Million to Carbon Sequestration Projects

LCG, May 7, 2008--The U.S. Department of Energy (DOE) yesterday announced awards of over $126.6 million to two carbon sequestration projects designed to demonstrate the potential for permanent storage of over one million tons of carbon dioxide (CO2) in geologic formations. A critical goal of the DOE is to develop carbon sequestration capabilities that will better enable the long-term use of coal for power production while controlling CO2 emissions to address climate change concerns.


Press releases

UPLAN Users United in San Francisco  (3/19/2008)

San Francisco, March 18, 2008 -- In conjunction with the upcoming release of UPLAN-Altos, LCG Consulting hosted a users conference last week in San Francisco, California. The highly anticipated enhancements of the UPLAN software, which provides comprehensive planning facilities for analyzing many new issues facing electricity market participants, brought out a large number of attendees representing nearly 20 organizations. The conference offered all users, both old hands and beginners, a unique opportunity for networking and exchanging information on many new market developments.



Previous Press Releases

UPLAN Users United in San Francisco (3/19/2008)
UPLAN Users Conference (1/25/2008)
Innovative UPLAN 7.5 Released, Most Advanced Electricity Modeling System Ever Available (12/7/2006)
LCG Consulting Launches a New Website (5/1/2006)
UPLAN 7.0 for Dispatch-Based Unit Commitment and Integrated Market Simulation (4/15/2004)
Transmission Investment Valuation: Weighing Project Benefits (3/1/2004)
Electricity Blackouts: Fixable or Fixture? New Study Offers Solutions For Lowering Risk of Electricity Blackout (9/29/2003)
The Electric Reliability Council of Texas, Inc. chooses LCG's UPLAN integrated models for generation, transmission, reliability, and investment analysis (4/23/2003)
LCG Opens European Office in Paris (7/11/2002)
Integrated Generation and Transmission Model for Locational Marginal Price (LMP) Analysis, Fully Compliant with FERC Order 2000 and Standard Market Design (SMD) (6/26/2002)


Copyright © 2008 LCG Consulting. All rights reserved. Terms and Copyright

Products

UPLAN-NPM   UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model

Wind   Wind
Wind Power Development

UPLAN-G   UPLAN-G
The Gas Procurement and Competitive Analysis System

Utrack   UTRACK
The UPLAN Daily Tracking and Database Management System

Plato   PLATO
Database of Plants, Loads, Assets, Transmission...

UPLAN-MAM   MAM
UPLAN MAM (Multi Area Model)