EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Holtec Signs Strategic Cooperation Agreement with Utah and Hi Tech Solutions to Deploy Nuclear SMRs

LCG, May 1, 2025--Holtec International (Holtec) announced the signing on April 29 of a strategic cooperation agreement with the State of Utah and Hi Tech Solutions, a leading nuclear services provider based in Kennewick, Washington, to collaborate in the deployment of Holtec's SMR-300s (small modular reactor) in Utah and the broader Mountain West region. Hi Tech will play a leading role in the project development and workforce training to support the rise of new nuclear power generation in the region.

Read more

EPA and Texas Railroad Commission Sign Memorandum of Agreement for Permitting Geologic Storage of Carbon Dioxide

LCG, April 29, 2025--Officials from the U.S. Environmental Protection Agency (EPA) and Texas Railroad Commission (RRC) signed a memorandum of agreement (MOA) today outlining the state’s plans to administer programs related to carbon storage wells, known as Class VI wells. The MOA signing is a required step in the RRC’s application to be granted authority to permit Class VI wells in the state of Texas. EPA is currently preparing a proposed approval of RRC’s primacy application.

Read more

Industry News

AEP to Build New West Texas Line

LCG, Sept. 22, 2000A new electric transmission line crossing part of West Texas was announced yesterday by American Electric Power Co. and the Lower Colorado River Authority, a state conservation and reclamation district that wholes power.

The joint venture will build a $90 million, 345 kilovolt line that will span 150 miles across the Edward Plateau. It will be the western part of a 225 mile line that will move power from Big Spring to a point near Fort Worth, moving power from new gas-fired plants in the west to energy hungry population centers. Some new wind farms in the west will also be served.

AEP will build and operate the 150-mile segment and the Lower Colorado River Authority will pay for and own it. It should be noted that the Texas Colorado River isn't the same one that flows through the Grand Canyon.

The Electric Reliability Council of Texas, a regional unit of the North American Electric Reliability Council, also acts as the state's independent system operator, in charge of the Texas electric transmission grid. It has urged new lines to accommodate generation of many new merchant power plants in various parts of Texas.

ERCOT has pointed to a half-dozen areas in Texas that are under-served by transmission, including the stretch to be covered by the AEP, LCRA link.

More than 30 new power plants are expected to add over 18,000 megawatts of generation to the Texas system around the time the state's electricity market opens to competition in 2002, or shortly thereafter.

AEP said arranging for the new line's transmission corridor is underway. Approval is needed from the Public Utility Commission of Texas before the line can be built.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service