|
News
|
LCG, November 18, 2026--The SPP Board of Directors yesterday announced that it approved the 2026 Integrated Transmission Plan (ITP) at its November 17 meeting. The board authorized SPP to issue notification to construct (NTC) letters for select projects in the approved portfolio. The portfolio includes new and upgraded transmission lines designed to move more electricity across the region. SPP evaluated potential projects and worked with hundreds of stakeholders over two years to develop a portfolio designed to make the SPP system more reliable, lower costs and increase operational capabilities.
Read more
|
|
LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.
Read more
|
|
|
Industry News
FPL, Coastal Begin Building 535 Megawatt Texas Plant
LCG, Jan. 18, 2001FPL Energy said yesterday that construction has begun on a 535 megawatt natural gas-fueled power plant near Austin, Texas. The facility will be jointly owned by FPL and Coastal Power Co. and FPL will operate it.But those distinctions will not matter in a month or so, as the parent companies for both parties expect to complete their merger. FPL Group Inc., which also owns Florida Power & Light Co., and The Coastal Corp. announced a year ago today their plans to merge and expect to complete the deal within weeks.The new power plant, which will be called the Bastrop Energy Center, is located adjacent to the transmission systems of the Lower Colorado River Authority and Austin Energy. The Texas Colorado River is not the same one that flows through the Grand Canyon.The companies said they expect to complete construction of the new plant in the spring of next year.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|