|
News
|
LCG, November 18, 2026--The SPP Board of Directors yesterday announced that it approved the 2026 Integrated Transmission Plan (ITP) at its November 17 meeting. The board authorized SPP to issue notification to construct (NTC) letters for select projects in the approved portfolio. The portfolio includes new and upgraded transmission lines designed to move more electricity across the region. SPP evaluated potential projects and worked with hundreds of stakeholders over two years to develop a portfolio designed to make the SPP system more reliable, lower costs and increase operational capabilities.
Read more
|
|
LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.
Read more
|
|
|
Industry News
Cal Regulators Bar Utilities from Cutting Service;. Restraining Order Called 'Insulting, Unjustified'
LCG, Jan. 22, 2001The California Public Utilities Commission, meeting Friday in an "emergency session," imposed by a 2 to 1 vote a temporary restraining order on Pacific Gas & Electric Co. and Southern California Edison Co. in the inexplicable belief that the utilities intended to unilaterally abrogate their obligation to serve their customers.The utilities, PUC president Loretta Lynch said, "will not and may not abandon service to customers." Commissioner Henry Duque, who voted against the order, said that the heads of both utilities had told him that they had no intention to shirk their responsibility to their customers. PG&E said it made that plain to all the commissioners before the meeting.Gordon R. Smith, chief executive of PG&E responded to the order with something approaching high dudgeon. "For nearly 100 years, Pacific Gas & Electric Co. has been committed to providing safe and reliable service to our customers in Northern and Central California. Through fires, earthquakes, and other natural disasters, our obligation to serve has never wavered," he said."The commission's rhetoric (Friday) is an insult to the 19,000 men and women of PG&E who have worked tirelessly to minimize customer inconvenience" during last week's outages, Smith said.John Bryson, SoCal Edison's chief executive, called the restraining order "unjustified" and said it was "an insult to the ethic of the 13,000 employees of (the company) who have worked to keep the lights on for their customers."Bryson pointed out that SoCal Edison "has borrowed billions of dollars, which threatens the company's solvency, through eight and one-half months of inaction and delay by the CPUC, in order to continue to serve its customers."SoCal Edison said in a statement it "has no intention of unilaterally withdrawing from its obligation, a point that was made clearly and unambiguously to the president of the CPUC, Loretta Lynch, by Bryson in a phone conversation (Thursday) that was initiated by Lynch. Subsequently, this was reiterated in another call from Bryson to Lynch prior to (Friday's) meeting."SoCal Edison called the restraining order an abuse of its power by the CPUC. PG&E called it a waste of time.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|