News
LCG, May 1, 2025--Holtec International (Holtec) announced the signing on April 29 of a strategic cooperation agreement with the State of Utah and Hi Tech Solutions, a leading nuclear services provider based in Kennewick, Washington, to collaborate in the deployment of Holtec's SMR-300s (small modular reactor) in Utah and the broader Mountain West region. Hi Tech will play a leading role in the project development and workforce training to support the rise of new nuclear power generation in the region.
Read more
|
LCG, April 29, 2025--Officials from the U.S. Environmental Protection Agency (EPA) and Texas Railroad Commission (RRC) signed a memorandum of agreement (MOA) today outlining the state’s plans to administer programs related to carbon storage wells, known as Class VI wells. The MOA signing is a required step in the RRC’s application to be granted authority to permit Class VI wells in the state of Texas. EPA is currently preparing a proposed approval of RRC’s primacy application.
Read more
|
|
|
Industry News
SDG&E Supports San Diego Transmission Link
LCG, Oct. 8, 2001--San Diego Gas & Electric Co. on Friday filed with the California Public Utilities Commission testimony strongly backing construction of its proposed $271 million, 31-mile Valley-Rainbow Interconnect transmission power-line.The line, which could be completed by 2005, would link SDG&E's system at Rainbow and the Southern California Edison Co. system in Romoland."Whether or not new power plants are built in the region, the construction of the proposed project remains critical to the state's future electric reliability," SDG&E said in a statement."Due to the ever-changing landscape of the state's electric picture, we decided to test the need for the 500,000-volt Valley-Rainbow Interconnect by carefully exploring several different scenarios involving the need for the line," said James P. Avery, senior vice president of fuel and power operations for SDG&E."In each case, the common conclusion was that this project is required in 2005 and grows in importance every year thereafter. In our view, SDG&E's CPUC-mandated obligation to serve its customers with a reliable source of energy must involve the construction of this project."Once completed, the Valley-Rainbow Interconnect could connect the state's sources of power with a pathway that can accommodate as much as 1,000 megawatts."Providing an enhanced electric pathway linking power sources to the north and south should help put downward pressure on electric costs by enhancing competition while bolstering reliability for all electricity users in the region," Avery said.In the event that Southern California Edison's existing 500 kilovolt transmission system is interrupted, the Valley-Rainbow Interconnect would serve as an emergency backup for southwest Riverside County, Avery added.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|