News
LCG, August 27, 2025--Wärtsilä Energy announced yesterday an agreement with East Kentucky Power Cooperative (EKPC) to supply the engineering and equipment for a 217-MW power plant to be constructed in Liberty, Kentucky. The Wärtsilä equipment is scheduled for delivery in mid-2027, and the plant is expected to be commissioned in early 2028.
Read more
|
LCG, August 25, 2025--The Utah Office of Energy Development (OED), TerraPower and Flagship Companies announced today the signing of a Memorandum of Understanding (MOU) to explore the potential siting of a Natrium® nuclear reactor and energy storage plant in Utah. The MOU establishes a shared commitment to support advanced nuclear technologies to build Utah’s energy future and to prioritize reliability, economic growth and energy abundance.
Read more
|
|
|
Industry News
Arizona Merchant Plant Construction Underway
LCG, Jan. 23, 2002--The Mesquite generating station is the second largest merchant plant now being built in Arizona.Sempra Energy Resources, a subsidiary of Sempra Energy, is developing the plant, which is expected to have the first block of its overall capacity online by the middle of 2003. The combined-cycle plant will consist of two combustion turbines and a steam turbine, and is expected to produce at maximum output by early 2004. Each of the two blocks will be rated at 625 megawatts.The Mesquite plant is located in southwestern Arizona, near Arlington. The other, largest merchant power plant being built in the state is the Gila River plant, which should be rated at 2,300 megawatts.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|