|
News
|
LCG, December 8, 2025--Basin Electric Power Cooperative (Basin Electric) and NextEra Energy Resources, LLC (NextEra) today announced that they have signed a memorandum of understanding (MOU) to explore the joint development of the River Run Energy Center, a new combined-cycle natural gas-fueled generation facility in Basin Electric's North Dakota service territory. The proposed facility will have a planned capacity of approximately 1,450 MW.
Read more
|
|
LCG, December 2, 2025 — LCG today announced the release of its PJM Congestion Outlook for January–March 2026, delivering a fundamentals-based, three-month forecast designed to help traders and risk managers better navigate congestion risks in PJM’s FTR markets.
Read more
|
|
|
Industry News
Brazil Suspends Gas Development
LCG, March 20, 2000- Plans to develop Brazil's natural gas importation have been suspended while the Brazilian government rethinks its energy production.Brazil has been experiencing a severe energy shortage, rationing energy over the last nine months. Nine tenths of Brazil's electricity comes from hydroelectric plants, and drought has seriously limited energy generation.The government had planned to expand gas imports from Bolivia to generate more energy but has decided to reevaluate its gas-fired energy needs first.In October of 2001 international companies were allowed to apply to expand the pre-existing 30 million cubic meter pipeline. Many foreign investors want access to the pipeline but are dismayed at the falling Brazilian currency, 16 percent last year over the dollar. In addition, Brazil's thermoelectric development has stagnated and only a few of the planned gas-fired plants have been built.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|