EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

The Nuclear Company Announces a 6.6 GW Nuclear Project to Commence Construction by 2030 in Kentucky

LCG, October 21, 2026--The Nuclear Company today announced a proposed nuclear energy campus in Kentucky that could potentially provide 6.6 GW of electric generating capacity. The Prosperity One nuclear energy campus, located along the Ohio River in eastern Kentucky, could accommodate up to six Westinghouse AP1000 reactors and would be the largest nuclear power generation site in the nation if fully constructed.

Read more

FERC Proposes NEPA Revisions to Streamline Air Quality Analyses and Accelerate Natural Gas Projects

LCG, October 16, 2026--The Federal Energy Regulatory Commission (FERC) announced on Thursday its new proposal to revise and accelerate its review of air quality effects for proposed natural gas projects under the National Environmental Policy Act (NEPA). The draft policy statement highlights revisions designed to (i) avoid unnecessary delays and duplicative analysis and (ii) deliver greater regulatory certainty and a streamlined path forward for project applicants.

Read more

Industry News

Summer Reserves for California Adequate

LCG, June 10, 2002--The California Independent System Operator reports that it has had less power than needed to achieve a 15 percent reserve margin, but so far, the margin of 7 percent has been adequate to stave off rolling blackouts.

In order to be at 7 percent or above, the ISO had to ask some generators to put off scheduled maintenance last week until after periods of elevated air-conditioning demand passed.

Some conservation that started with the onset of the 2000 power crisis seems more or less permanent, but some financial incentives have also been provided. A vote by the Legislature renewed the 20/20 program, which gives a 20% refund to households that keep usage 20% below their consumption of power in the 2000 summer season. Conservation may help, but according to the ISO, 1,500 new megawatts of generation will be needed annually to keep pace with new demand.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service