|
News
|
LCG, March 25, 2026--Arbor Energy today announced an agreement with GridMarket, an energy and infrastructure project facilitator, to deliver up to 5 GW of zero-emission power starting in 2029. GridMarket supports large energy users, including data centers, manufacturers, and logistics providers, with securing reliable and cost-effective power.
Read more
|
|
LCG, March 18, 2026--The EIA released a new "In-depth Analysis" of the potential impact of faster-than-expected near-term growth in data center power demand on power generation and wholesale prices on March 12. The analysis models the lower 48 states through 2027 and compares results to its base case scenario. Key takeaway from this sensitivity analysis is the potential increase in fossil fuels in some regions and potentially a significant increase in wholesale prices in ERCOT.
Read more
|
|
|
Industry News
FP&L Expands Plant With Gas
LCG, June 14, 2002--An existing power plant in DeBary, Florida, will see one of two new planned gas-fired generating units go online today, to replace one of its three oil units.The utility Florida Power & Light, part of the FPL Group, intends in the fall to bring the Sanford plant's second gas unit into operation, with another 1970's-era oil-burner to be shut down at that time. With the third oil-fired unit will remain ready to provide backup power as needed, the overall capacity of the plant will rise from 950 megawatts to 2,050 megawatts.The plant will use combined-cycle technology, which incorporates steam turbines to capture energy released from the fossil-fuel combustion, achieving higher fuel efficiency than is possible with the gas turbines alone.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|