|
News
|
LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.
Read more
|
|
LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.
Read more
|
|
|
Industry News
Ontario-Based Bruce Power Unit Online
LCG, Dec. 23, 2003--The Ontario power grid has an additional 1,500 megawatts of generating capacity online, after Bruce Power announced that the nuclear-powered Unit 4 of Bruce A has reached full power.The next unit to be brought back online will be Unit 3, which will offer approximately an additional 1,500 megawatts. Bruce Power is partially owned by TransCanada Corporation, which retains a 31.6 percenter stake in Bruce Power. TransCanada also owns one-third of Bruce Power Inc., the general partner of Bruce Power.The restart of Unit 4 began in October, when the output level of the unit was not allowed to exceed 50 percent as tests were conducted.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|