EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Report on Blackout Faults FirstEnergy

LCG, Apr. 6, 2004--A report completed by a joint U.S.-Canadian group on the causes of the August blackout that affected a large region in the U.S. and part of Canada found that FirstEnergy's inadequate response to initial outages was largely responsible for the scale of the events that followed.

The report also listed a number of specific operational and maintenance measures that it said should be implemented in order to enhance reliability, and found that not many changes had yet been made since the blackout. The authors noted that there is currently no widespread standard for trimming trees near high-voltage transmission lines, despite the fact that local utilities routinely monitor trees near less critical distribution lines, based on rules established by state commissions. Disagreement among utilities on the issue of what maintenance near high-voltage lines might entail has discouraged the North American Electric Reliability Council from issuing standards.

In addition to the conclusion that load shedding by FirstEnergy in the amount of 1,500 megawatts might have headed off the blackout, the report also drew attention to shortcomings on the part of reliability councils and other grid monitors. FirstEnergy's senior vice president of energy delivery, Chuck Jones, was quoted in the Wall Street Journal as saying "We don't think that's factually correct," in response to the report's assertion that the company failed to conduct voltage analyses to a degree that could have made its service area less vulnerable to widespread failures.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service