|
News
|
LCG, March 31, 2026--Holtec International yesterday announced that it successfully completed a milestone test necessary to return Holtec's Palisades Nuclear Generating Station to service. The 805-MW pressurized water reactor (PWR) is located in Michigan and was shut down by Entergy in May 2022. Holtec acquired the facility in June 2022 and has pursued a path to return the plant to service.
Read more
|
|
LCG, March 25, 2026--Arbor Energy today announced an agreement with GridMarket, an energy and infrastructure project facilitator, to deliver up to 5 GW of zero-emission power starting in 2029. GridMarket supports large energy users, including data centers, manufacturers, and logistics providers, with securing reliable and cost-effective power.
Read more
|
|
|
Industry News
Covid-19 and ERCOT SARA Scenario Analysis of RESOURCE ADEQUACY June-December 2020
LCG May 25, 2020--LCG Consulting released a report of ERCOT market performance for the second half of 2020, using market simulations with LCG’s UPLAN Network Power Model. Resource adequacy analysis for the region is critical during extreme summer loading conditions as the reserves have tightened because of recent retirements. On top of this, the COVID-19 pandemic, and the society’s response to it, are continuing to cause observed impacts to the power system and market. The UPLAN uses the generation resources from Seasonal Assessment of Resource Adequacy (SARA) and the load forecasts based on Moody’s Analytics.
Download
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|