EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

NY Wind Projects Poised to Start Construction

LCG, August 22, 2007--The New York State Public Service Commission (PSC) last week granted Certificates of Public Convenience and Necessity (CPCN) for the Cohocton and Dutch Hill wind projects in Steuben County, New York.

The combined electric generating capacity of the two wind farms is 127.5 MW. The Cohocton project will include a maximum of 35 Clipper wind turbines, each with a generating capacity of 2.5 MW. Each wind turbine will include a 315-foot diameter, three-blade rotor mounted on a 262-foot tall tubular steel tower. The Dutch Hill project will include up to 16 Clipper wind turbines of the same size.

The projects are being developed by Canandaigua Power Partners and Canandaigua Power Partners II, which are wholly-owned subsidiaries of UPC Wind Partners, LLC. According to the developer, construction on the Cohocton project is to commence this week.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service