EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Holtec Signs Strategic Cooperation Agreement with Utah and Hi Tech Solutions to Deploy Nuclear SMRs

LCG, May 1, 2025--Holtec International (Holtec) announced the signing on April 29 of a strategic cooperation agreement with the State of Utah and Hi Tech Solutions, a leading nuclear services provider based in Kennewick, Washington, to collaborate in the deployment of Holtec's SMR-300s (small modular reactor) in Utah and the broader Mountain West region. Hi Tech will play a leading role in the project development and workforce training to support the rise of new nuclear power generation in the region.

Read more

EPA and Texas Railroad Commission Sign Memorandum of Agreement for Permitting Geologic Storage of Carbon Dioxide

LCG, April 29, 2025--Officials from the U.S. Environmental Protection Agency (EPA) and Texas Railroad Commission (RRC) signed a memorandum of agreement (MOA) today outlining the state’s plans to administer programs related to carbon storage wells, known as Class VI wells. The MOA signing is a required step in the RRC’s application to be granted authority to permit Class VI wells in the state of Texas. EPA is currently preparing a proposed approval of RRC’s primacy application.

Read more

Industry News

TVA Awards Bechtel Contract for Second Reactor at Watts Bar

LCG, October 16, 2007--The Tennessee Valley Authority (TVA) Board yesterday announced the selection of Bechtel Power Corp. for a $1 billion construction and engineering contract to complete a second nuclear reactor at TVA's Watts Bar nuclear station in Tennessee.

The estimated cost to complete the 1,180-MW nuclear unit is $2.5 billion, and the unit is scheduled to commence operations by 2013.

Prior to being awarded the contract, Bechtel led a $20 million cost-and-scheduling study used by TVA to support completing the Watts Bar Unit 2 reactor.

In August 2007, the TVA Board approved plans to complete the second unit at Watts Bar Nuclear Plant in Spring City, Tennessee. The additional capacity will help serve the growing demand for electricity without increasing carbon emissions.
Watts Bar Unit 1 began operating in 1996, and Unit 2 will use the same pressurized water reactor design as Unit 1.

Prior to pursing the completion of Watts Bar Unit 2, TVA completed the refurbishment of Browns Ferry Unit 1 in May 2007. The reactivation of Unit 1, mothballed over 20 years, added 1,200 MW of carbon-free electric generating capacity to TVA's fleet.

Browns Ferry Unit 1 originally commenced commercial operation on August 1, 1974, but safety concerns following a fire led to its closure in 1985. Units 2 and 3 were also closed for a period but returned to operations in the late 1990s. All three reactors are now generating power, and the total plant capacity is approximately 3,600 MW.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service