EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PJM Reports Resources Are Adequate to Meet Growing Summer Demand

LCG, May 7, 2026--PJM issued today its Summer Outlook 2026, which forecasts sufficient generation for typical peak demand this summer. PJM states that it is prepared to call on contracted demand response resources to reduce electricity use during times of high system stress.

Read more

NRC Approves Oklo's Principal Design Criteria Topical Report for Aurora Powerhouse

LCG, May 6, 2026--Oklo Inc. ("Oklo"), an advanced nuclear technology company, announced today that the U.S. Nuclear Regulatory Commission (NRC) has approved the Principal Design Criteria (PDC) topical report for the Aurora-INL (Idaho National Laboratory) nuclear small modular reactor (SMR), which is currently under construction in Idaho. The PDC topical report establishes a regulatory framework that defines the fundamental safety, reliability, and performance requirements to guide future reactor licensing and design activities, and the approved report should simplify future applications and reduce the need to re-review established material.

Read more

Industry News

SCE Announces Agreements for 726 MW of Solar Power

LCG, June 18, 2009--Southern California Edison (SCE) announced yesterday that it executed two power purchase agreements (PPAs) with Solar Millennium for the output from two, 242-MW solar-thermal stations, with an option to double the capacity of one station.

The locations for the planned solar power stations are in southeastern California, near the towns of Blythe and Ridgecrest. The stations are scheduled to commence operations in 2013 and 2014.

Solar Millennium, LLC, Berkeley, a subsidiary of Solar Millennium, is to develop the projects that employ a parabolic trough design. Long, parabolic mirrors reflect sunlight onto a tube, where the concentrated solar energy heats a working fluid that in turn is used to create superheated steam. The steam is used in a traditional steam turbine - generator set for power production.

Solar Millennium stated that construction may begin by the end of of next year, given timely approval of permit applications and other regulatory approval.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service