EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EPA Proposes Rule Changes to Coal Combustion Residuals (CCR) Requirements to Restore American Energy Dominance

LCG, April 10, 2026--The U.S. Environmental Protection Agency (EPA) announced yesterday a rule proposing several revisions to the federal regulations governing the disposal of coal combustion residuals (CCR) and the beneficial use of CCR. The EPA designed the rule to encourage resource recovery, allow for site-specific considerations in permitting, and provide regulatory relief while continuing to protect human health and the environment. The EPA will be accepting comments on the rule for 60 days after publication in the Federal Register, and it will also hold an online public hearing on the rule.

Read more

Vault 44.01 Receives EPA Class VI Permit Approval for CCS Project in Indiana

LCG, April 9, 2026--Vault 44.01 Ltd. (Vault) announced today that the U.S. Environmental Protection Agency (EPA) Region 5 has issued a final Underground Injection Control (UIC) Class VI permit for the One Carbon Partnership CCS project (the "OCP Project") near Union City, Indiana. The One Carbon Partnership is a joint venture between Cardinal Ethanol and Vault.

Read more

Industry News

Iberdrola Commissions Three Wind Farms Across the U.S.

LCG, January 24, 2013--Iberdrola announced early this week that its installed capacity has increased by 265 MW following the commissioning of three wind farms located in California, New Hampshire, and Massachusetts.

The largest of the three wind farms is the 189-MW Manzana Wind Farm, located in the Tehachapi area near the town of Rosamond, California. The project includes 126 of GE's 1.5-MW wind turbines. San Diego Gas & Electric (SDG&E) has a 20-year power purchase agreement (PPA) for 100 MW of the plant output, and the City of Santa Clara?s Silicon Valley Power (SVP) has a 20-year PPA for 50 MW.

In New Hampshire, the 48-MW Groton Wind Farm is sited along two ridge features in the town of Groton and consists of 24 Gamesa G87, 2.0-MW wind turbines.

The third project is the 28.5-MW Hoosac Wind Power Project, located in Massachusetts. The project includes 19, 1.5-MW turbines from GE, and all of the energy is under a PPA with NSTAR Electric, a subsidiary of Northeast Utilities.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service