EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

SPP Approves 2026 Integrated Transmission Plan to Address Grid Reliability, Growth and Energy Affordability

LCG, November 18, 2026--The SPP Board of Directors yesterday announced that it approved the 2026 Integrated Transmission Plan (ITP) at its November 17 meeting. The board authorized SPP to issue notification to construct (NTC) letters for select projects in the approved portfolio. The portfolio includes new and upgraded transmission lines designed to move more electricity across the region. SPP evaluated potential projects and worked with hundreds of stakeholders over two years to develop a portfolio designed to make the SPP system more reliable, lower costs and increase operational capabilities.

Read more

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

Industry News

MidAmerican Achieves Major Milestones in $1.9 Billion Wind VIII Project in Iowa

LCG, January 15, 2015-MidAmerican Energy recently completed three wind farms in Iowa, adding over 500 MW of electric generating capacity. The wind farms are part of the 1,050-MW Wind VIII development project, which MidAmerican plans to complete in 2015. The project was announced in May 2013, with an estimated cost of $1.9 billion and planned completion by the end of 2015.

The Wind VIII project includes five wind farms that will use Siemens' 2.3-MW wind turbines. The wind farms placed into service last year are: the 251-MW Lundgren Wind Farm, the 119.6-MW Macksburg Wind Farm, and the 140.8-MW Wellsburg Wind Farm.

In 2013, a fourth wind farm expansion, the Vienna II project, was completed that added 43.7 MW to the Vienna Wind Farm.

The Highland Wind Farm, which is scheduled for completion this year, will add another 495 MW of capacity. In total, the Wind VIII project includes 448 wind turbines, with a combined generating capacity of 1,050 MW.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service